| 注册
Yuhang Low-Altitude Economy Demonstration Project
2025-08-12T16:39:03+08:00
收藏
In the first phase, 40 mu of land will be leveled to build a new 600m × 35m runway, a 30m × 20m hangar, and a 3,000m² apron. The second phase will involve leveling 20 mu of land to construct a smart parking lot (100m × 80m), a new entrance gate for the aviation camp, and a gatekeeper’s room; hardening, landscaping, and beautifying 100 meters of roads; building a new 20m × 30m steel-structured hangar with a height of 6 meters; constructing a 10m × 200m runway slope with an average thickness of 1 meter; installing new water, electricity, and drainage systems; and constructing a 2,500m² research and learning building. Additionally, a two-story folk cave dwelling with 21 rooms and 200m × 3.5m of hardened and landscaped roads will be built. A 100m × 80m non-powered amusement park and recreational facilities will be established. The planned site covers more than 20 mu, with 7.68 mu of usable fixed building area, designated for reception, accommodation, and dining areas (including a sunset restaurant, water bar, back kitchen, farm experience area, and children’s playground). The accommodation area will feature 20 stargazing rooms. An infinity pool, a 50-meter scenic creek, and five popular photo spots will also be created.

本项目联系方式
登录后查看

本网站不对所提供项目信息的真实性、准确性或可行性做出任何形式的保证,基于此信息而产生的任何法律后果与本网站无关。