This project primarily involves the construction of a research and development laboratory, pilot production line, and industrial production base for high-temperature superconducting new materials, with an annual production capacity of 200 tons. The design process includes raw material proportioning, smelting, forming, heat treatment, processing, and performance testing. The project covers an area of approximately 55 mu, with a total construction area of about 35,000 square meters and a total investment of 520 million RMB. Full investment from investors is sought for the project. High-temperature superconducting new materials offer high current density, high reliability, and cost-effectiveness, and can be applied in cutting-edge fields such as aerospace, nuclear fusion, and military industries. Yima City can provide the necessary conditions for project construction, with well-developed transportation and power infrastructure to meet project needs. The project is currently in the planning stage, and enterprises are being sought for investment and construction.